Sign In | Join Free | My gimpguru.org |
|
Brand Name : VIBRA
Model Number : PCF-500
Certification : ISO 9001:2015
Place of Origin : Shanghai, China
MOQ : 1 set
Price : Negotiation
Payment Terms : T/T, D/P, Western Union, MoneyGram, L/C
Supply Ability : 15 set/month
Delivery Time : 7-35 days
Packaging Details : 8.616 CBM
Name : Vibration Pile Driver
Vibration Frequency : 3200rpm
Operation Pressure : 30Mpa
Centrifugal Force : 828KN
Arm Weight : 820kg
Hammer Weight : 3600kg
Excavator : 60-68T
Max Piling Depth : 21 m
HS Code : 8430100000
Material : Steel, Core materials are all imported
Condition : New
Color : Blue/Yellow/Red/White, customized color available
60 to 68 ton excavator mounted vibro hammer for long sheet piling construction projects
In recent years, with the rapid development of the market application of steel plate pile, the application of large steel plate pile, steel protective cylinder and PC mixed pile is becoming more and more widespread. The upgrading of pile driving machine is also accelerating, and the pile driving hammer is developing in the direction of specialization and large scale.
In order to lead the market development trend, our company has successively developed two large pile driving hammerheads, PCF-500 and PCF-600, which are respectively matched on the main engine with a dead weight of 60 tons ~78 tons to meet the construction requirements of 18 meters ~24 meters steel sheet pile, steel guard cylinder and PC pile.
PCF-500 is suitable for matching in the overall body weight of 60~68 tons excavator, engine power in 320~345kw, hydraulic pump maximum flow in 760L.
Technical Parameters
itemmodel | PCF-500 | PCF-600 |
Eccentric weight (kg) | 77.5 | 79.5 |
Eccentric moment (kgm) | 9.2 | 10.5 |
Exciting force (kN) | 828 | 905 |
No-load amplitude (mm) | 9.3 | 9.8 |
Arm weight (kg) | 820 | 880 |
Hammer head weight (kg) | 3600 | 3700 |
Excavator (T) | 60~68 | 69~78 |
Maximum Piling Depth (m) | 21 | 24 |
Competitive advantage
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment. L/C can be accepted for order above USD 35,000.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!
![]() |